Skip to content
Toiture Montréal FR
  1. Home
  2. Areas
By area

Montreal Roofing, Area by Area

According to the City of Montreal (October 2026), the solar reflectance index threshold required on a flat roof ranges from 56 to 78 from one area to another. Redoing a roof in LaSalle and redoing a roof in Anjou are two different processes, and the rules for roofing in Montreal change from one borough to another, for the permit and for the materials. This page compares seven areas, and each one then has its own page.

01

Why look at it area by area

A quote for roofing in Montreal is prepared with the borough's rules in hand. Those rules decide three things.

  • whether you need a permit before work starts
  • which roofing materials are accepted
  • which documents go with the application

A roofer who works on the island often knows these rules. Still, know what your borough asks for before you sign, and have the contract state who handles the permit application.

02

The seven areas at a glance

The table sums up what the City publishes for each borough. The details, exceptions and required documents are on each area's page.

AreaFlat roofSloped roof
LaSallePermit to replace the roofing. Permitted materials depend on roof area: a list under 300 m², a white or reflective material or an SRI of at least 56 abovePermit to replace the roofing. List of permitted new materials
VerdunPermit to replace the roofing. Green roof, white material or SRI of at least 78Permit to replace the roofing. The new material must match the format, colour and texture of the original or of a comparable building
AnjouNo permit. White material, SRI of at least 78 or green roofNo permit to repair or replace
LachinePermit to replace the roofing. List of materials for existing buildings, SRI of at least 78 or green roof for new onesPermit to replace the roofing or change the structure
Montréal-NordPermit to replace the roofing. White material, SRI of at least 78 or green roofPermit to replace the roofing
Saint-LaurentPermit to install or replace the roofing. White gravel, SRI of at least 78 or green roofNo permit to repair or replace with the same material. Permit if the material or the structure changes
PierrefondsPermit for a roof made of materials other than asphalt, or if the material changes. Light-coloured material with an SRI of at least 66, or green roofNo permit to replace asphalt shingles with asphalt shingles. Permit if the material changes
03

What changes most from one area to another

The permit. Anjou requires none, for a flat roof or a sloped roof. LaSalle, Verdun, Lachine and Montréal-Nord, on the other hand, require one to replace the roofing on both types of roof. Saint-Laurent sits in between. A permit is needed for flat roofing, but not to redo a sloped roof with the same material. In Pierrefonds, the exemption named by the City covers asphalt shingles replaced with asphalt shingles. Any change of material there requires a permit.

The flat roof. In five of the seven areas, the City requires white, light-coloured or reflective roofing, or a green roof. The solar reflectance index threshold is 78 in Verdun, Anjou, Montréal-Nord and Saint-Laurent, and 66 in Pierrefonds. LaSalle sets it at 56, but only for roofs over 300 m². Below that surface, LaSalle works with a list of permitted materials. Lachine does the same for existing buildings and keeps the threshold of 78 for new construction.

The sloped roof. The City publishes fewer material requirements here, with three exceptions. In Verdun, new roofing must match the format, colour and texture of the original material, or those of a comparable building on the same stretch of street. LaSalle imposes a list of new materials. Pierrefonds publishes a list of prohibited materials.

04

How to use these pages

  1. Find your area in the table.
  2. Open its page to read the full rules.
  3. Then pick the page that matches your roof, whether flat, shingled, commercial or a full replacement.
  4. Ask us for a quote and mention your area.

If your area is not on the list, the same City procedures exist for each of the 19 boroughs. Your borough's permit counter remains the reference.

05

The limits of these pages

The rules were read on the City website on October 3, 2026. Rules change, and a building can have a feature the summary does not show, such as heritage value. Always confirm with the permit counter before ordering materials.

FAQ

Frequently asked questions

Are roofing rules the same everywhere in Montreal?

No, permit and material rules vary by Montreal borough. The same job can require a permit in one area and none in the area next door.

Where can you redo a roof without a permit in Montreal?

In Anjou, the City requires no permit to repair or replace a flat or sloped roof. In Saint-Laurent, a sloped roof can be redone without a permit if the material stays the same. In Pierrefonds, the City names a single case, asphalt shingles replaced with asphalt shingles.

My area is not on the list. What should I do?

Read the City procedure for your borough, or call your permit counter. You can also ask us for a quote. The form accepts every area of the Montreal region.

Need a roofer in Montreal?

Describe your roof in two minutes. The request is free, with no obligation.

Request a quote